The Aqmos R2D2-72 typically comes with a connection set and a bypass/mounting block. This block is essential as it allows you to bypass the softener entirely if you ever need to use unsoftened water outdoors. 1. Shut Off the Main Water Supply
Here’s a clear, step-by-step content piece for installing the (assuming this is a DIN-rail energy meter / Modbus device, common for AQMOS models). If your device has specific differences, adjust the wiring colors/terminals accordingly.
It is highly recommended to install a standard sediment house water filter before the softener inlet to keep sediment from clogging the internal valve. Essential Tools and Components Checklist aqmos r2d272 installation new
The installation process of the Aqmos R2D272 was surprisingly straightforward. The comprehensive manual provided clear, step-by-step instructions that made it easy to follow along. The system comes with a wall-mounting kit, which simplifies the process of finding the perfect spot for the unit.
: Attach the bypass valve to the rear of the unit and secure it with the provided clips and screws. The Aqmos R2D2-72 typically comes with a connection
: 1" AG drinking water connection and a 12mm waste water connection.
Open the cover of the cabinet housing. Pour regenerative salt (in tablet or block form) into the cabinet. The R2D2-72 can store up to 50 kg of salt at a time, meaning you will rarely need to refill it. 2. Initiate a Manual Regeneration Shut Off the Main Water Supply Here’s a
. You will need an installation space close to your main water inlet, a nearby drain (for the backwash/regenerative wastewater), and a standard electrical socket (230V/50Hz). 2. Verify Your Water Pressure
This comprehensive guide outlines the required tools, site preparation, plumbing steps, and initial programming parameters for your new Aqmos R2D2-72 1. Pre-Installation Requirements & Site Selection